Built-in steps with LAVAREDO: Step-by-Step built-in design guide

A 6-step kitchen design process in black and white graphic format, with the word "LAVAREDO" at the top, and a lineup of hands, tables, materials, and kitchen cabinets, from consultation to installation.

Working process with our built-in company (LAVAREDO)

1) Consult the problem with the sales department and designers.

Tell us your lifestyle, space, budget, and inspiration (moodboard/sample photos) to clearly define the scope of your work. Contact us: Call 02 127 0492 or LINE OA: @lavaredo-kitchen

2) Send information for preliminary price assessment.

Floor plan, approximate dimensions, list of appliances/equipment and materials desired to calculate the approximate price and time frame.

3) Confirm the work – make an appointment to measure the area.

After seeing the budget and concept that you like, proceed to confirm and make an appointment for the team to measure the work site (deposit 5,000 baht/zone **can be deducted from the product cost when ordering production) to ensure the accuracy of the design and production & price.

4) The technician measures the work area (Site Measurement)

Check the fire-water-smoke exhaust pipes, wall/floor tilt, door swing distance, and work site conditions to lock the specifications before production.

5) Production and quality control at the factory (Factory & QC)

(50% deposit to start production) Produce the workpiece according to the approved design, check QC, surface details, hardware and assemble and test before packing 30-45 days including installation.

6) Delivery, installation and collection (Delivery & Installation)

(50% deposit before starting installation) Install according to standards, align and adjust doors/drawer, test usage before delivery and provide maintenance advice. After-sales: Our service team is ready to help with maintenance, adjustments and provide advice after installation.
Two men work on tall gray cabinets in a bright room. One is on a ladder; the other is spray-painting. Protective sheets cover parts.

What customers should prepare in advance

  • Latest floor plan/area dimensions
  • List of electrical appliances (model/size)
  • Color tone – preferred material (melamine/laminate/paint/stone top)
  • Intended budget period

FAQ

Q: How long does it take?
A: The timeframe depends on the size and complexity of the project. A clear timeline will be provided after the site is measured and the design is approved.

Q: During production, can the design be changed?
A: Yes, it can be adjusted before production starts. Timelines and prices may change as the list is revised.

Q: What is the guarantee?
A: There is a warranty according to the terms and conditions of the materials/hardware and installation work (specified in the quotation and delivery documents).